Seatec delivered custom made Turbine Tents

Seatec recently received an order for the design, fabrication and delivery of special purpose Turbine Tents (6 pcs).
These units will be used by an offshore institute measuring gasflow on the seabed.
Each unit is equipped with a high-end sampler unit.
All units will be loadtested (750kg) prior to delivery.
<< Back to overview